Re-roof first, then solar: why a new roof permit is Florida's best solar sales trigger
Ask a Florida installer what kills a good solar deal and the roof comes up fast. The homeowner is interested, the numbers work, then someone looks up: the shingles are 20 years old. Now it's a roof replacement first, a second contractor, a second loan conversation, and often no deal at all.
Turn that around and you get the best moment to sell solar in Florida: the weeks right after a homeowner puts on a new roof.
Why the new-roof moment works
- The roof objection is gone. Panels go on a roof that will outlast them, with no rip-and-replace to price in.
- The homeowner is already investing in the house. They just spent five figures and are thinking about the next 20 years there.
- It's on the public record. Every Florida re-roof needs a building permit, so you can see where they happen, which week, and for how much.
What 90 days of re-roof permits show
We looked at every re-roof permit filed on single-family and duplex homes in Miami-Dade County (including the City of Miami) and Orlando in the 90 days to October 4, 2026, using public records.
| Miami-Dade | Orlando | |
|---|---|---|
| Re-roof permits, 90 days | 2,016 | 542 |
| Per weekday | ~31 | ~8.5 |
| Owner-occupied (homestead) | 67% | 44% |
| No solar permit on record | 99% | 94% |
| Median year built | 1970 | 1963 |
| Median re-roof job value | $18,800 | $9,700 |
Three things stand out:
- Volume is real. In Miami-Dade alone, about 31 homes a weekday get a new roof.
- Almost none of them have solar. Nearly every re-roofed home is still an open opportunity. (Our Miami-Dade County solar records go back to October 2024; City of Miami and Orlando records go back to 2016.)
- A big share aren't buyers. A third of Miami-Dade re-roofs, and more than half in Orlando, are on rentals or investor-owned homes. A renter can't sign a solar contract. Filtering to owner-occupied homes is the difference between a useful list and a wasted route.
97% of the homes in our data that got a new roof were built before 2006, which matches what installers see at the door: Florida's older housing stock is reaching the end of its first or second roof, and hurricane seasons speed that up.
How to work the trigger
- Get the list weekly or daily, not monthly. The window is short. Roofers and their solar partners are already in the conversation.
- Filter hard: single-family or duplex, owner-occupied, no existing solar. That removes about 4 in 10 permit leads before anyone spends a stamp.
- Lead with the roof. "Your new roof is good for 25 years. So are panels. This is the cheapest time you'll ever have to add them." Mail first, then knock a short, pre-qualified route.
- Track every house. Mark mailed, knocked, appointment, won, so your reps never work the same address twice.
See it for your ZIP codes
PermitScoop turns these permits into a short list every weekday at 7am: owner-occupied homes that just filed a re-roof, panel upgrade or battery permit, with homes that already have solar removed. Browse the live numbers for Miami-Dade, Miami and Orlando, or get a free sample for your ZIP.
See this week's solar-ready homes in your ZIP
Every weekday: owner-occupied homes in your ZIPs that just filed a new roof, panel upgrade or battery permit, with homes that already have solar removed.